Resolution No. 2025-66Passed
The city sets aside $241,800 for work to replace the Bayview Drive bridge. The work includes surveys, soil checks, bridge design, and bid papers. The bridge needs replacement because of weight limits and flood damage.
Before 6:00 PM
Listed on the City Council agenda. The agenda packet has 20 pages about it.
6:00 PM meeting
Moved by Benjamin Hughes, seconded by Angie Phillips.
6:00 PM meeting
Moved by Benjamin Hughes, seconded by Angie Phillips.
CITY COUNCIL Minutes - September 15 2025 · p. 4